Housing Authority – Midlands

Location: Midlands

 Project Type: Dismantle, Base & Build

 No. of Bays: 6

 Battery Type Supplied: SecureLine

 Site Start Date: August 2019

 Site Handover: August 2019

Hanson Manager: Rob Barker

Project went very smoothly from initial contact to completion, we were kept up to date with all aspects of the installation and Hanson’s reacted quickly and efficiently to any points raised that needed addressing”

Working closely with Hanson’s ensured we fully utilised the area available during the building design.”

Security was a key concern and the build and door security perfectly matched our expectation.”

Building Specifications
Our ‘Best Selling’ battery garage approved by most Councils and Housing Associations was ideally suited to this project. The SecureLine product range offered an excellent level of security ideal for this location. The integral guttering design prevents vandalism and the panel finish is ideal in discouraging potential graffiti. All materials used ensure this build was a quality product providing a low maintenance solution for the client.

  • Interlocking Concrete Panels with steel reinforcement, 3-point panel bolting system and multispar finish
  • High quality 4-Point Locking Main Doors
  • Rear sloping Galvanised Steel Roof Sheets with felt underlay and anti-tamper fixings
  • Plastisol Coated UV Protected Galvanised Steel Fascias
  • PVCu Integral Guttering incorporated into the garage
  • Integral Downpipes with tough metal spouts
  • Internal Cement Fillet
  • Timber Weather Bar
  • 10 Year Structural Guarantee

Before And After Images of Recent Battery Garages

stledger beforestledger after
gabe mbeforegabe after